Duration: 21.1. 00:00 – 13.12. 23:59
Access to Herisau station is restricted. The restriction lasts from 21.01.2025, 00:00 until 13.12.2025, 23:59. In Herisau, the east underpass (St. Gallen side) is closed due to construction work. During this time, access to tracks 2 and 3 is only possible via the west underpass.
Train services at Flums station are interrupted.
Duration: 21.4. 22:40 – 28.5. 06:00
Due to construction work
Please consult online timetable. Passengers travelling between Flums and Walenstadt please use the replacement bus service (EV)
Line S17, IR35 does not stop in Flums
Further information is available at Bahnhof Flums: Umbau für stufenfreien Zugang zu den Zügen.
Train services at Flums station are interrupted.
Duration: 21.4. 22:40 – 28.5. 06:00
Due to construction work
Please consult online timetable. Passengers travelling between Flums and Walenstadt please use the replacement bus service (EV)
Line S17, IR35 does not stop in Flums
Further information is available at Bahnhof Flums: Umbau für stufenfreien Zugang zu den Zügen.
Train services at Flums station are interrupted.
Duration: 21.4. 22:40 – 28.5. 06:00
Due to construction work
Please consult online timetable. Passengers travelling between Flums and Walenstadt please use the replacement bus service (EV)
Line S17, IR35 does not stop in Flums
Further information is available at Bahnhof Flums: Umbau für stufenfreien Zugang zu den Zügen.