Zimmerberg-Basistunnel
Bahn-2000-Strecke
from track 3
Zimmerberg-Basistunnel
Bahn-2000-Strecke
Zimmerberg-Basistunnel
Bahn-2000-Strecke
from track 3
Zimmerberg-Basistunnel
Bahn-2000-Strecke
from track 3
Zimmerberg-Basistunnel
Bahn-2000-Strecke
from track 3
Zimmerberg-Basistunnel
Bahn-2000-Strecke
The Servion, Moléson stop from the 385 line is closed.
Duration: 16.12.2024 05:55 – 30.11. 23:59
Reason not yet known
Please use the stop Servion, Clos de l'Auberge
Information from PostBus.ch
Zimmerberg-Basistunnel
Bahn-2000-Strecke
The St-Martin FR, village stop from the 384 line has been moved.
Duration: Until 30.1.2026 approx. 23:59
Due to construction work
Please consult online timetable before each trip
The replacement stop is 400 meters in direction of Bussigny-sur-Oron, croisée
Information from PostBus.ch
from track 3
Zimmerberg-Basistunnel
Bahn-2000-Strecke
from track 3
Zimmerberg-Basistunnel
Bahn-2000-Strecke