arrival track 1
arrival track 1
arrival track 2
Cunstruction timetable for the Lötschberg car transport service: From Monday, 20.10.2025 to Saturday, 13.12. 2025. Reason: construction work in the Lötschberg summit tunnel. Check online timetable.
Duration: until 13.12. 05:00
Information from BLS car transport service
Limited train service between Flamatt and Thörishaus Station.
Duration: 19.10. to 29.11. between 22:20 and 04:00, always Mon, Tue, Wed, Thu, Fri, Sun
Due to construction work
Affected: line S1
Please consult online timetable.
Impact: train cancellations and timetable changes
arrival track 1AB
arrival track 1AB
arrival track 1
arrival track 1
arrival track 1
arrival track 1AB
arrival track 1
arrival track 1
arrival track 1