Access to Zürich Flughafen station is restricted.
Duration: 1.4. 00:00 – 28.10. 23:59
The lift to platform 1/2, sector C/D is affected
Interrupted train service between Murten/Morat and Avenches.
Duration: 26.8. to 29.8. between 21:00 and 04:30
Due to construction work
Affected: line S5
Please consult online timetable
Impact: train cancellations and timetable changes
Access to Zürich Flughafen station is restricted.
Duration: 1.4. 00:00 – 28.10. 23:59
The lift to platform 1/2, sector C/D is affected
Bahn-2000-Strecke