Interrupted train service between Neuchâtel and Ins.
Duration: 26.10. 01:00 – 10.11. 04:00
Due to construction work
Affected: lines IR66, S5, S52
Please consult online timetable.
Impact: train cancellations and timetable changes
from track 2
Bahn-2000-Strecke
Interrupted train service between Neuchâtel and Ins.
Duration: 26.10. 01:00 – 10.11. 04:00
Due to construction work
Affected: lines IR66, S5, S52
Please consult online timetable.
Impact: train cancellations and timetable changes
from track 2
Bahn-2000-Strecke
Cunstruction timetable for the Lötschberg car transport service: From Monday, 20.10.2025 to Saturday, 13.12. 2025. Reason: construction work in the Lötschberg summit tunnel. Check online timetable.
Duration: until 13.12. 05:00
Information from BLS car transport service
from track 2
Bahn-2000-Strecke
arrival track 3
Limited train service between Basel SBB and Mulhouse.
Duration: 3.11. 08:00 – 13.12. 23:59
Due to construction work
from track 1
arrival track 3
arrival track 3