Limited train service between Zürich HB and München Hbf.
Duration: 7.7. 00:00 – 16.7. 23:59
Due to construction work
Please consult online timetable
Line EC does not stop in St. Margrethen SG
arrival track 4
Limited train service between Wettingen and Killwangen-Spreitenbach.
Duration: 7.7. 00:30 – 18.8. 05:00
Due to construction work
Please consult online timetable
Line IR16, IR36, RE12, S12, S19, S23 is operating according to a modified timetable
The lines 231, 320, 321, 322, 332, 338, 339, 350, 444 and 445 : There are restrictions on the S17 line between Wohlen and Dietikon..
Duration: 7.7. 05:00 – 31.7. 23:59
Due to construction work
As the journey time of the replacement bus (EV) is longer, the journey is extended by approx. 15 minutes
The online timetable has been changed
Information from PostBus.ch
arrival track 4
Limited train service between Wettingen and Killwangen-Spreitenbach.
Duration: 7.7. 00:30 – 18.8. 05:00
Due to construction work
Please consult online timetable
Line IR16, IR36, RE12, S12, S19, S23 is operating according to a modified timetable
arrival track 4
Limited train service between Wettingen and Killwangen-Spreitenbach.
Duration: 7.7. 00:30 – 18.8. 05:00
Due to construction work
Please consult online timetable
Line IR16, IR36, RE12, S12, S19, S23 is operating according to a modified timetable