Limited train service between Wettingen and Killwangen-Spreitenbach.
Duration: 7.7. 00:30 – 18.8. 05:00
Due to construction work
Please consult online timetable
Line IR16, IR36, RE12, S12, S19, S23 is operating according to a modified timetable
Limited train service between Zürich HB and München Hbf.
Duration: 7.7. 00:00 – 16.7. 23:59
Due to construction work
Please consult online timetable
Line EC does not stop in St. Margrethen SG
arrival track 4