Duration: 30.3. 17:00 – 27.4. 23:59
The lift to platform 9/10, sector ABC is affected. Please use the lift via platform 9/10, sector D
Further information is available at Basel SBB platform 9/10.
Interrupted service: Basel SBB - MünchensteinDuration: 2.4. 22:15 – 7.4. 01:00
Reason: construction work
Affected: lines IC 51, IR 56 and S 3
Please consult online timetable. Passengers travelling between Basel SBB and Münchenstein please use the replacement bus service (EV)
arrival track 3
arrival track 3
Interrupted train service between Frenkendorf-Füllinsdorf and Lausen.
Duration 2.4. – 6.4. respectively 23:20 – 05:20
Reason: construction work
Affected: lines IC 21, IC 2345, IC 2349, IC 6, IR 2344, IR 26, IR 27, S 3 and IR 37
Please consult online timetable. Passengers travelling between Frenkendorf-Füllinsdorf and Lausen please use the replacement bus service (EV)
arrival track 5
Limited service between Basel, Heuwaage and Basel, Brausebad [tram].
Duration: unknown
Due to construction work
Line 6
Line 6 will be diverted between Heuwaage and Brausebad. The diversion will run via the stops Basel, Zoo Bachletten, and Basel, Schützenhaus
arrival track 9