arrival track 4
Limited service between Basel, Schifflände and Basel, Barfüsserplatz [tram].
Duration: until 7.9. 00:30
Due to construction work
Lines 6, 8, 14, 15, 16
Limited service between Basel, Heuwaage and Basel, Brausebad [tram].
Duration: unknown
Due to construction work
Line 6
Line 6 will be diverted between Heuwaage and Brausebad. The diversion will run via the stops Basel, Zoo Bachletten, and Basel, Schützenhaus
Limited service between Basel, Bankverein and Basel, Schifflände [tram].
Duration: 29.6. 04:00 – 7.9. 04:00
Due to construction work
Line 11
Line 11 will be diverted and will not stop at Basel, Barfüsserplatz and Marktplatz. It will also stop at Basel, Kunstmuseum | Wettsteinplatz | Messeplatz | Clarastrasse | Claraplatz and Rheingasse. Online timetable has been changed
Further information: Traffic information
Limited service between Basel, Dreispitz and Aesch BL, Dorf [tram].
Duration: 18.5. 04:00 – 13.12. 04:00
Due to construction work
Line 11
Passengers travelling between Basel, Dreispitz and Aesch, Dorf please use the replacement bus (EV). The online timetable has been changed.
Further information: BLT Line 11 Projects
Limited service between Basel, Schifflände and Basel, Barfüsserplatz [tram].
Duration: until 7.9. 00:30
Due to construction work
Lines 6, 8, 14, 15, 16
Limited service between Basel, Heuwaage and Basel, Brausebad [tram].
Duration: unknown
Due to construction work
Line 6
Line 6 will be diverted between Heuwaage and Brausebad. The diversion will run via the stops Basel, Zoo Bachletten, and Basel, Schützenhaus
Limited train service between Basel SBB and Olten.
Duration: 1.6. 00:40 – 27.7. 05:00
Reason: construction work
Please check online timetable
arrival track 5
Zimmerberg-Basistunnel
arrival track 2