Bahn-2000-Strecke
arrival track 5
Limited train service between Biel/Bienne and Grenchen Nord in the direction of Grenchen Nord.
Duration: 28.3. 00:00 – 29.3. 23:59
Reason: construction work
Affected: line IC 51
Please consult online timetable
Limited train service between Oensingen and Biel/Bienne.
Duration: 28.3. 00:00 – 29.3. 23:59
Reason: construction work
Affected: lines IR 55 and S 20
Please consult online timetable
Line S20 does not stop in Luterbach-Attisholz. Line IR55 is operating according to a modified timetable
Bahn-2000-Strecke
arrival track 6