Duration: 21.6. 00:00 – 31.8. 23:59
Due to construction work
The access to platform 1-4 is affected
Limited train service between Wettingen and Killwangen-Spreitenbach.
Duration: 7.7. 00:30 – 18.8. 05:00
Due to construction work
Please consult online timetable
Line IR16, IR36, RE12, S12, S19, S23 is operating according to a modified timetable
Limited train service between Zürich HB and München Hbf.
Duration: 20.7. 00:00 – 19.8. 23:59
Due to construction work
Please consult online timetable
Line EC does not stop in St. Margrethen SG
Gotthard-Basistunnel
Information on EC 16 from Lugano
Very high passenger numbers expected. We recommend that you make a seat reservation or choose another connection. Tip: For your journey, we recommend that you use the InterCity (IC) 21, Lugano 13:58 - Arth-Goldau 15:11.
Limited train service between Zürich HB and München Hbf.
Duration: 20.7. 00:00 – 19.8. 23:59
Due to construction work
Please consult online timetable
Line EC does not stop in St. Margrethen SG