Limited train service on the Lausanne - Palézieux line between Grandvaux and Puidoux.
Duration: 19.1. 04:00 – 13.6. 04:00
Reason: construction work
Affected: lines R 8, R 9, S 40 and S 41
Further information is available at Network plan valid from 19/01/2026 04:00 to 13/06/2026 04:00 .
Limited train service at Fribourg/Freiburg.
Duration: 23.2. 08:30 – 2.4. 04:30
Reason: construction work
Affected: lines S 30, S 40, S 41 and SN
Please consult online timetable
arrival edge E
Interrupted train service between Murten/Morat and Avenches.
Duration: 15.3. to 27.3. between 21:13 and 04:35, always Mon, Tue, Wed, Thu, Sun
Due to construction work
Affected: line S5
Please consult online timetable.
Impact: train cancellations and timetable changes
Limited train service on the Lausanne - Palézieux line between Grandvaux and Puidoux.
Duration: 19.1. 04:00 – 13.6. 04:00
Reason: construction work
Affected: lines R 8, R 9, S 40 and S 41
Further information is available at Network plan valid from 19/01/2026 04:00 to 13/06/2026 04:00 .
arrival track 2
Bahn-2000-Strecke
arrival track 4A-D