arrival track 3
Interrupted train service between Murten/Morat and Avenches.
Duration: 29.8. 21:50 – 1.9. 04:20
Due to construction work
Affected: line S5
Please consult online timetable
Impact: train cancellations and timetable changes
arrival track 6
Access to Zürich Flughafen station is restricted.
Duration: 1.4. 00:00 – 28.10. 23:59
The lift to platform 1/2, sector C/D is affected
Access to Zürich Flughafen station is restricted.
Duration: 1.4. 00:00 – 28.10. 23:59
The lift to platform 1/2, sector C/D is affected
Bahn-2000-Strecke
arrival track 6
Access to Zürich Flughafen station is restricted.
Duration: 1.4. 00:00 – 28.10. 23:59
The lift to platform 1/2, sector C/D is affected
Bahn-2000-Strecke
arrival track 5