Information about construction work Bern.
From 1 September 2025, platform 4 will only be accessible from the west side. Please use the access via Passerelle Welle. From 1 September 2025, departure platforms will change – please note the displays at the station and the online timetable
Information from TPF
Construction work at Bern station.
Duration: 1.9. 04:00 – 1.1.2026 00:00
Lines IR66, S5, S52
Due to construction work, there will be restrictions and timetable adjustments at Bern station from 1 September 2025. IR 66 is affected. The IR66 07:48 and 08:48 from Bern will now run at minute xx.53 from Bern and will no longer stop at Bern Stöckacker and Bern Bümpliz Nord. The IR66 17:23 from Berne is now only accessible via Passerelle Welle (west side of the station). We recommend consulting the online timetable shortly before each journey.
arrival track 50
Access to Zürich Flughafen station is restricted.
Duration: 1.4. 00:00 – 28.10. 23:59
The lift to platform 1/2, sector C/D is affected